Description:
Support the decommissioning process of facilities, utilities and fixed process equipment located in companies site.
Functions:
- Decommissioning Process
- Inactive the equipment.
- Complete the documentation forms and approvals.
- Calibration (Latest / Last Calibration)
- Obtain copy of the latest calibration activities performed to the equipment / utility and/or system and all associated instrumentation.
- HEPA Filter (Final Certification)
- Obtain copy of the latest certification performed to the equipment / utility.
- Computerized System Withdrawal
- To obtain an executed copy of the Equipment Computerized System checklist and completed for as applicable.
- Logbook Last Cleaning Entry
- Obtain a copy of the operational logbook reflecting the last cleaning.
- Qualification Status Technical Assessment
- Obtain copy of the approved “Equipment Qualified State Assessment” .
- EHS Evaluation
- Obtain the Decommissioning EHS Evaluation.
- Completed all the Decommissioning Documentation
- Completed the Decommissioning List
Requirements:
- Experience working in the Decommissioning Process and Documentation in the regulated industry.
Work Methodology:
- 100% On-stie
- Administrative Shift
- 6 Weeks Duration
- Professional Services Contract